Provide timely communication for the project with the IADP Leader and the CSJU Executive Team.
Perform risk evaluation analysis and regularly update the contingency plans.
Ensure that the agreed project objectives and deliverables are achieved, and ensure quality of work.
Control of the actual expenditures/resources against the planned ones and undertake timely actions, if and when a
departure trend is suspected.

Project management

In depth, analysis of both the current Functional Test Procedure and Requirement Specification, as provided by the
IADP Leader.
Trade-off analysis (compliance/cost/suitability) on the Emulator definition, Automated procedures, Fault and corrective
actions.
Develop a system paradigm and the relevant architectural design, coping with the requirements and specifications.

Phase1: Analysis and design review

Define and assess the cost-effective architecture of the electro-avionic equipment emulators.
Manufacturing, testing and integration of the electro-avionic equipment emulators in the functional test procedure.
Deliver the electro-avionic equipment emulators, along with the electrical schemes and user’s manual.

Phase 1 - Architecture and manufacturing of electro-avionic equipment emulators

Test bench development.
Test Bench and HW delivery.

Phase 1 - Test Bench manufacturing

Development of the Test Bench firmware of the WP5.
Firmware installation and delivery of the documentation (approved by the IADP).

Phase 1 – Firmware development

User-friendly interface development.

Delivery of the LabView Application, source code and documentation.

Phase 1 – User Interface development

Implement the database architecture, as defined by the design directives developed in WP2.

Develop and deliver the software module for the update, management and query.

Phase 1 – Fault data base development

Phase 2 – Analysis and design review

Analysis of the test procedures and the standard workflow, as provided by the IADP Leader.
Develop a trade-off design, capable of achieving the “to be” requirements, including bus protocol compatibility
requirements, fault detection and tracking and recording of the messages from the avionic system.
Demonstrate the real advantage, with respect to the standard and current processes.

Phase 2 – Development of Multipurpose FTP Test Bench

Demonstration the functional efficiency and financial viability (ROI) of the Multipurpose FTP test bench.
Delivery of the HW of the multipurpose FTP test bench.
Definition and validation of the automated procedures.
Definition of the Fault and corrective actions data base.
Delivery of the FW.

Dissemination and Exploitation

Communicate the project outcomes to the targeted audience.
To disseminate the project trough at least two relevant peer-reviewed journals

or conferences with Green or Gold Open
access.
Prepare a business plan, forecast of the ROI, in view of a commercialisation route.

Ethics requirements

The objective is to ensure compliance with the 'ethics requirements' set out in this work package.